Removed outdated TODO comments and updated documentation to reflect work completed in Phase 3E (Position Ratings and WebSocket Handlers). Changes: - Removed 2 stale WebSocket emission TODOs in game_engine.py (lines 319, 387) These referenced Phase 3E-Final work completed on 2025-01-10 - Updated backend/CLAUDE.md Phase 3E status section Marked defender retrieval as COMPLETE (Phase 3E-Main) Clarified SPD test still pending (needs batter speed rating) Marked runner advancement as COMPLETE (Phase 3D) - Updated TODO_RESOLUTION_SUMMARY.md Marked defender lookup TODO as resolved with implementation details Documentation: - Created TODO_AUDIT_2025-01-14.md - Complete TODO audit (53 items) - Created TODO_VERIFICATION_RESULTS.md - Verification of resolved items - Created TODO_SUMMARY.md - Quick reference priority matrix - Created TODO_CLEANUP_COMPLETE.md - Cleanup work summary Test Status: - Backend: 9/9 PlayResolver tests passing - No regressions introduced Remaining Work: - 41 legitimate TODOs properly categorized for future phases - 8 Phase F6 TODOs (game page integration) - 5 Quick win TODOs (optional polish) - 28 Future phase TODOs (auth, AI, advanced features) 🤖 Generated with [Claude Code](https://claude.com/claude-code) Co-Authored-By: Claude <noreply@anthropic.com>
2.5 KiB
2.5 KiB
TODO Summary - Quick Reference
Date: 2025-01-14 Status: Post-Phase F5, Pre-Phase F6
Quick Stats
| Category | Count | Priority |
|---|---|---|
| Stale Comments (already done) | 12 | Clean up now |
| Phase F6 (game integration) | 8 | Next sprint |
| Quick Wins (optional polish) | 5 | Optional |
| Future Phases (F7+, Phase 4, Week 9) | 28 | Defer |
| TOTAL | 53 | - |
Priority Matrix
🔴 Priority 1: Clean Up Now (30 min)
Already completed - just remove comments
12 stale TODOs:
- 2 WebSocket emission comments (game_engine.py)
- Position ratings documentation update (CLAUDE.md)
- Defender lookup verification
- Update TODO_RESOLUTION_SUMMARY.md
Why Now: Avoid confusion, accurate documentation
🟡 Priority 2: Phase F6 Integration (6-8 hours)
Critical for game lobby system
8 TODOs:
- Backend (3): Game API endpoints (list/get/create)
- Frontend (5): Game page integration, lobby UI
Why F6: Core workflow for creating/joining games
🟢 Priority 3: Quick Wins (1 hour)
Optional code polish
5 TODOs:
- Remove unused config fields (strikes_for_out, balls_for_walk)
- Clean up outcome arrays
- Fix toast positioning
- Test data improvements
- Method naming refactor
Why Optional: Nice to have, not blocking
⚪ Priority 4: Future Phases (Defer)
Not MVP critical
28 TODOs:
- Authorization (10): WebSocket auth checks → Phase F7+
- Authentication (2): Discord OAuth → Phase F7+
- AI Opponent (6): Decision-making logic → Week 9
- Advanced Gameplay (5): Uncapped hits, interactive decisions → Phase 4+
- SPD Test (1): Batter speed rating → Phase 3E-Final or F6
- Rare Play (3): Define RP logic or accept placeholder → Decide
- Statistics (1): Earned runs calculation → Future
Why Defer: MVP works without these, add value later
Detailed Breakdown
See full documents:
- TODO_AUDIT_2025-01-14.md - Complete audit with context
- TODO_VERIFICATION_RESULTS.md - Verification of resolved vs pending
Recommended Next Actions
- ✅ Done: TODO audit and verification complete
- Next: Clean up 12 stale TODOs (~30 min)
- Then: Proceed with Phase F6 integration (8 TODOs, 6-8 hours)
- Optional: Quick wins if time permits (5 TODOs, 1 hour)
Cal's Decision Point:
- Start with Priority 1 cleanup now? (30 min)
- Skip cleanup and go straight to Phase F6? (your call)
- Do quick wins first? (optional 1 hour)