strat-gameplay-webapp/.claude/TODO_SUMMARY.md
Cal Corum 4cadb6566c CLAUDE: Clean up stale TODO comments from Phase 3E completion
Removed outdated TODO comments and updated documentation to reflect
work completed in Phase 3E (Position Ratings and WebSocket Handlers).

Changes:
- Removed 2 stale WebSocket emission TODOs in game_engine.py (lines 319, 387)
  These referenced Phase 3E-Final work completed on 2025-01-10
- Updated backend/CLAUDE.md Phase 3E status section
  Marked defender retrieval as COMPLETE (Phase 3E-Main)
  Clarified SPD test still pending (needs batter speed rating)
  Marked runner advancement as COMPLETE (Phase 3D)
- Updated TODO_RESOLUTION_SUMMARY.md
  Marked defender lookup TODO as resolved with implementation details

Documentation:
- Created TODO_AUDIT_2025-01-14.md - Complete TODO audit (53 items)
- Created TODO_VERIFICATION_RESULTS.md - Verification of resolved items
- Created TODO_SUMMARY.md - Quick reference priority matrix
- Created TODO_CLEANUP_COMPLETE.md - Cleanup work summary

Test Status:
- Backend: 9/9 PlayResolver tests passing
- No regressions introduced

Remaining Work:
- 41 legitimate TODOs properly categorized for future phases
- 8 Phase F6 TODOs (game page integration)
- 5 Quick win TODOs (optional polish)
- 28 Future phase TODOs (auth, AI, advanced features)

🤖 Generated with [Claude Code](https://claude.com/claude-code)

Co-Authored-By: Claude <noreply@anthropic.com>
2025-11-14 08:12:08 -06:00

97 lines
2.5 KiB
Markdown

# TODO Summary - Quick Reference
**Date**: 2025-01-14
**Status**: Post-Phase F5, Pre-Phase F6
---
## Quick Stats
| Category | Count | Priority |
|----------|-------|----------|
| **Stale Comments** (already done) | 12 | Clean up now |
| **Phase F6** (game integration) | 8 | Next sprint |
| **Quick Wins** (optional polish) | 5 | Optional |
| **Future Phases** (F7+, Phase 4, Week 9) | 28 | Defer |
| **TOTAL** | 53 | - |
---
## Priority Matrix
### 🔴 Priority 1: Clean Up Now (30 min)
**Already completed - just remove comments**
12 stale TODOs:
- 2 WebSocket emission comments (game_engine.py)
- Position ratings documentation update (CLAUDE.md)
- Defender lookup verification
- Update TODO_RESOLUTION_SUMMARY.md
**Why Now**: Avoid confusion, accurate documentation
---
### 🟡 Priority 2: Phase F6 Integration (6-8 hours)
**Critical for game lobby system**
8 TODOs:
- **Backend** (3): Game API endpoints (list/get/create)
- **Frontend** (5): Game page integration, lobby UI
**Why F6**: Core workflow for creating/joining games
---
### 🟢 Priority 3: Quick Wins (1 hour)
**Optional code polish**
5 TODOs:
- Remove unused config fields (strikes_for_out, balls_for_walk)
- Clean up outcome arrays
- Fix toast positioning
- Test data improvements
- Method naming refactor
**Why Optional**: Nice to have, not blocking
---
### ⚪ Priority 4: Future Phases (Defer)
**Not MVP critical**
28 TODOs:
- **Authorization** (10): WebSocket auth checks → Phase F7+
- **Authentication** (2): Discord OAuth → Phase F7+
- **AI Opponent** (6): Decision-making logic → Week 9
- **Advanced Gameplay** (5): Uncapped hits, interactive decisions → Phase 4+
- **SPD Test** (1): Batter speed rating → Phase 3E-Final or F6
- **Rare Play** (3): Define RP logic or accept placeholder → Decide
- **Statistics** (1): Earned runs calculation → Future
**Why Defer**: MVP works without these, add value later
---
## Detailed Breakdown
See full documents:
- **TODO_AUDIT_2025-01-14.md** - Complete audit with context
- **TODO_VERIFICATION_RESULTS.md** - Verification of resolved vs pending
---
## Recommended Next Actions
1.**Done**: TODO audit and verification complete
2. **Next**: Clean up 12 stale TODOs (~30 min)
3. **Then**: Proceed with Phase F6 integration (8 TODOs, 6-8 hours)
4. **Optional**: Quick wins if time permits (5 TODOs, 1 hour)
---
**Cal's Decision Point**:
- Start with Priority 1 cleanup now? (30 min)
- Skip cleanup and go straight to Phase F6? (your call)
- Do quick wins first? (optional 1 hour)