Mantimon TCG - Monster collecting trading card game
Go to file
Cal Corum 6f871d7187 Add frontend project plan (F0-F8)
Comprehensive Vue 3 + Phaser 3 frontend plan with 8 phases:
- F0: Project Foundation (Vite, Vue, Tailwind, Pinia, Socket.IO)
- F1: Authentication (OAuth flow, token management)
- F2: Deck Management (collection, deck builder, starter selection)
- F3: Phaser Integration (Vue-Phaser bridge, board layout, cards)
- F4: Live Gameplay (WebSocket sync, actions, turn flow)
- F5: Polish & UX (reconnection, animations, timer)
- F6: Campaign Mode (blocked on backend Phase 5)
- F7: Multiplayer (blocked on backend Phase 6)
- F8: Pack Opening (blocked on backend Phase 5)

F0-F5 are unblocked - all backend dependencies (Phases 2-4) complete.

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-01-30 08:02:07 -06:00
.claude/skills Add backend-phase skill for consistent development workflow 2026-01-29 19:11:27 -06:00
backend Mark Phase 4 (Game Service + WebSocket) as complete 2026-01-30 07:35:40 -06:00
docs Implement Phase 2: Authentication system 2026-01-27 21:49:59 -06:00
frontend Add frontend project plan (F0-F8) 2026-01-30 08:02:07 -06:00
AGENTS.md Consolidate CLAUDE.md into AGENTS.md 2026-01-26 14:21:29 -06:00
PROJECT_PLAN.md Add RPG campaign structure inspired by GBC Pokemon TCG 2026-01-24 18:22:36 -06:00

Mantimon TCG Documentation

Active Documentation

File Description
ARCHITECTURE.md Technical architecture overview covering frontend (Vue+Phaser), backend (FastAPI), database schema, real-time communication, game engine design, and offline fork considerations.
GAME_RULES.md Game rules document defining campaign structure, base ruleset, energy system, deck building, win conditions, turn structure, card types, and status conditions.

Legacy Documentation

Historical documents from completed development phases, preserved for reference.

File Description
legacy/SYSTEM_REVIEW.md Comprehensive code review of the core game engine (Jan 2026). Identified 15 issues across models, effects, and engine - all resolved. 826 tests passing.
legacy/PROJECT_PLAN_ENERGY_EVOLUTION.md Implementation plan for energy/tool attachment refactor and evolution stack system. Changed attached_energy/attached_tools from list[str] to list[CardInstance]. Completed Jan 2026.